Showing posts with label Knitting for boys. Show all posts
Showing posts with label Knitting for boys. Show all posts

Saturday, December 29, 2012

Christmas Knitting

The dust of frenzied gift making has settled and I finally have time to share what I have been doing with my bits and pieces of free time. Part of my time managment problem is that I have a really bad habit of working on, Oh I don't know, 3-7 different project going on at the same time. Having so many projects on needles and in the "to sew" pile leaves little time to think about writing. I also find it incredible hard to put down the hand on creative stuff and blog, although I'm not sure why since I waste a very good portion of my time messing about on the Internet.

On to the the knitting...

My list of gifts  I wanted to make for people for Christmas was a long one, longest in history. Some got done and some didn't even get started *sigh* The first item I absolutely had to make was one of the only two things my little guy asked for: a grey snake. I looked high and low for such a thing out there in the world and apparently there is no such thing in the stuffed animal kingdom. Black, blue, green and even pink but no grey.

I set to knitting choosing the curly snake pattern out of Itty-Bitty Toys. I needed this snake to be a slight bit bigger and fast so I used Cascade Eco which is a bulky yarn. I followed the pattern as written and came up with this!


He loves it!

I couldn't be happier even if he thinks it came from Santa no matter how much I tell him otherwise. He finally came up with the compromise that I made it but Santa brought it.



Tuesday, October 9, 2012

Kids Clothes Week: Hats

Oooh I can barely contain my excitement about this whole challenge. I mean if this went on ALL the time, you know the having to be accountable and such, I would never have to buy anything at a store ever ( I kid, sort of.)

I work well with deadlines and other peoples expectations and this is why I did alright in college. Yes it's true that I almost always did everything (maybe even a 12 page paper) the night before it was due. Scrambling to put the finishing touches on projects at 2, 3 or ever 4AM and then managing to somehow function, look good and be running on time (this was back before I drank coffee too.)

So here I am with a literal mountain of fabric and project ideas, not to mention blog posts to write. As I was cooking dinner and occasionally checking on the littles I wondered "How am I supposed to do this and still manage to wash clothes, cook, clean and pay attention to my kids?"

The answer is still unclear but I am typing this in a clean living room having already washed my fabric, put away dinner and I even have a project to show off.  *I typed this last night as I was waiting for my fabric to dry

Ready set GO!!!




To be fair I did not just whip these up today. I finished them today. I'm taking this week to help me get back on track with my time spent here on the the blog, finishing old projects and starting projects that have, until now, lived only in my head.

Project Low Down

Pattern: my own made up simple hat. CO 133, knit a 1x1 rib  for about 7 or 8 rows until it looked how I wanted, added a couple random stripes  to give each hat a way for me to tell who's who's. Even decreases starting after the hat measured about 5 inches.

Needles: Size 2 for ribbing, 3 for hat

Yarn: Koigu that the boys picked out themselves.